Time & Pay
Days Between Dates Calculator
Enter a start and end date to see how many calendar days have passed. Include the end date to count every date on a trip, at an event or in a reporting period.
On this page
Elapsed calendar days
Enter both dates to see the elapsed and inclusive counts.
Your dates stay in this tab.
The method
How to count days between dates
Count one elapsed day each time you move from one calendar date to the next. Monday to Tuesday is one elapsed day. If both Monday and Tuesday belong to your range, there are two dates to count. Every complete group of seven counted days makes one week.
Example 1
March 1 to March 31, 2026
Check in on March 1 and check out on March 31 and you have 30 nights. For an event open on every date from March 1 through March 31, count 31 dates.
- Elapsed
- 30 days
- Including both dates
- 31 dates
- Inclusive span
- 4 weeks and 3 days
Example 2
February 28 to March 1 in a leap year
In 2028 the date after February 28 is February 29. One more day brings you to March 1. A calendar covering the whole event marks three dates.
- Elapsed
- 2 days
- Including both dates
- 3 dates
Example 3
A one-day event starts and ends on the same date
If a workshop opens and closes on November 24, no calendar boundary passes between its two dates. The event still occupies one date on the calendar.
- Elapsed
- 0 days
- Including both dates
- 1 date
Before you calculate
Assumptions & limits
- Count every calendar date, including weekends and holidays.
- Dates from year 0001 through 9999 use Gregorian leap-year rules throughout. Historical calendars that switched on different dates may give different counts.
- A date count measures calendar boundaries. Elapsed hours across a clock change depend on the times and time zones.
- Both dates and your selected counting rule stay in this tab until you choose to copy, print or download them.
Keep in mind
Common mix-ups
Should I include the end date?
For the number of days that have passed, use elapsed days. For a reporting period or an event that includes its opening and closing dates, choose Include end date.
How does February 29 affect the count?
Each February 29 inside the range counts once. For example, February 28 to March 1 spans two elapsed days in 2000, but only one in 1900. Century years need to be divisible by 400 to have a leap day.
Does a month count as 30 days?
A calendar month can have 28, 29, 30 or 31 days. This result uses the dates you entered and breaks the count into seven-day weeks.
Sources & calculation notes
Defines a calendar date without a time zone, including month lengths in the Gregorian calendar.
Describes the Gregorian leap-year rule and how historical adoption dates varied.
Method and input rules checked: . Engineering validation; no professional specialist review is claimed.