Inventory & Operations Tools

Match your question to a tool, then check what to bring.

Five decisions behind a replenishment order

Work through one stock item at a time. The buffer, order trigger and purchase quantity answer different questions.

Follow one fictional item through all five decisions

Packing sleeves / SKU PACK-100

This illustrative item has demand of 40 units per calendar day, a daily demand standard deviation of 12, an average supplier lead time of 7 calendar days and a lead-time standard deviation of 1 day. These are made-up planning inputs, not a stocking recommendation.

  1. Plan the arrival window. Four supplier days + two transit days + one receiving day = 7 calendar days. Use completed deliveries to estimate the average and variation; one quote does not establish a reliable history.
  2. Size the buffer. At the illustrative 95% cycle service factor of 1.645: √(7 × 12² + 40² × 1²) ≈ 51.07 units of variation. 1.645 × 51.07 ≈ 84.01, rounded upward to 85 safety units.
  3. Set the trigger. 40 × 7 + 85 = 365 units. With 300 on hand, 100 already on order and 50 backordered, inventory position is 300 + 100 − 50 = 350 units, below the trigger.
  4. Choose a feasible quantity. Assume steady demand for 365 days: 40 × 365 = 14,600 units/year. At $50 per order and $3 annual holding cost per unit, theoretical EOQ is 697.61 units. With 100-unit packs and an 850-unit supplier minimum, the smallest feasible lot is 900 units. Its modeled annual ordering and cycle-stock holding costs total $2,161.11.
  5. Prepare the order. If you decide to buy 900 units at an agreed $15 unit price, the goods subtotal is $13,500. Review shipping, tax, supplier and delivery terms separately before downloading the purchase order.

The calculators open as separate tasks. Review and enter the applicable figures yourself; this guide does not transfer your business data. EOQ’s cycle-stock cost excludes the separate safety-stock buffer and constant goods expenditure.

Keep the printable replenishment map (PDF, 3 pages)

Authorize and record work

  • What work needs doing, and what was completed?

    Work Order Generator
    You’ll need
    Issuer, customer or department, reference, issue date and requested work; assignment and costs are optional.
    You’ll get
    A reviewed work order PDF or CSV, with a printable form and checked example.

Buffer, reorder timing & order quantity

  • How much extra stock covers demand and supplier variation?

    Safety Stock Calculator
    You’ll need
    Summary statistics or pasted daily demand and completed supplier lead times, plus a cycle service target.
    You’ll get
    A whole-unit safety buffer, its modeled assumptions and an associated reorder point.
  • When should I order more of this item?

    Reorder Point Calculator
    You’ll need
    Average daily demand, supplier lead time and safety stock; current inventory counts are optional.
    You’ll get
    A whole-unit reorder point and, if you add current stock, an inventory-position trigger.
  • How much should I order at a time?

    Economic Order Quantity Calculator
    You’ll need
    Annual demand, order cost and annual holding cost; supplier minimum, case packs and current lot size are optional.
    You’ll get
    A practical order quantity, cost comparison and average order frequency.
  • When will this order be ready, or when should I place it?

    Lead Time Calculator
    You’ll need
    A date and sequential supplier, shipping, receiving and buffer durations.
    You’ll get
    A planned delivery or order-by date with calendar-aware milestones and a downloadable text plan.

Stock performance & product codes

  • How quickly does my inventory turn?

    Inventory Turnover Calculator
    You’ll need
    COGS, inventory balances or average, and reporting-period days.
    You’ll get
    Period turnover, days in inventory and an optional target-stock comparison.
  • How can I assign consistent SKUs to product variants?

    SKU Generator
    You’ll need
    Product codes and variant options; optionally paste or import existing SKU codes.
    You’ll get
    A collision-checked catalogue preview, copyable codes and a downloadable CSV.

Freight, storage & field capacity

  • What is the density of this packed freight?

    Freight Density Calculator
    You’ll need
    Greatest outside packed dimensions, gross packed weight per unit and quantity; add a group for each different size or weight.
    You’ll get
    Shipment density, total packed volume and gross weight, with inspectable rows and local CSV or A4/Letter PDF.
  • How much grain volume is in these round bins?

    Grain Bin Capacity Calculator
    You’ll need
    Inside diameter and grain depth at the wall; add a centered peak or depression height when present.
    You’ll get
    Checked geometric volume and US volume bushels for each bin and the complete worksheet, with a downloadable CSV.
  • Can this implement cover the field work in my available days?

    Acres Per Hour Calculator
    You’ll need
    Full working swath, realistic working speed and field efficiency; add pass-acres, in-field hours and suitable days for a deadline check.
    You’ll get
    Effective acres per hour, work time, the deadline gap and the minimum mathematical working swath.

Investigate a recurring problem

  • What evidence supports this explanation, and what should we check next?

    5 Whys Template
    You’ll need
    An observed problem, possible explanations, supporting evidence and a proposed follow-up action.
    You’ll get
    A private editable investigation record, a blank printable template and completed PDF or text downloads.

Connect the replenishment decisions

Lead time sets the arrival window; safety stock sets a buffer; reorder point checks when to act. Choose the order quantity separately with EOQ. The printable map separates these jobs with checked examples and includes an inventory turnover check.

Download the inventory replenishment map (PDF, 3 pages)

Have a shipment quote? Allocate shared charges to each SKU with the Landed Cost Calculator, then use that unit cost in a pricing check.